G4CCH | 5.4 Metre Dish Project 1999 |
The Foundations Sept 99... Getting to this stage seemed to take for ever. All of the soil removed from the hole was bagged up and move by car to the local tip, fortunately it's only 1/4 mile away. The hole is 1.5m diameter and 1.2m deep. The circular brick wall is 2.4m dia |